BRUSH
BRUSH Vouliagmeni 2015 It was decided during the main review of the space, that the concrete on the ceiling and sidewall should be revealed. The ceiling was kept in its bare form, with the electrical and mechanical installations running exposed, in organized formation. The sidewall was hammered in order to remove all the pre-existing plaster…